A-Z Eventz is beneath upkeep

Views: 54
0 0
Read Time:5 Minute, 22 Second


The Ducon Infratechnologies Rights subject 2026 might be hit the September 03, 2026 and shut on September 10, 2026. The firm has set a report date of the rights subject on August 26, 2026. The firm will supply 24,99,42,758 shares by way of this rights subject and the corporate will gather ₹24.99 crores and the corporate worth of this subject has been introduced at ₹1 per share as per the face worth of ₹1.

Ducon Infratechnologies Rights Issue

Ducon Infratechnologies Limited is an Indian technology-driven firm providing infrastructure and clean-energy options for the facility, industrial and environmental sectors. Its companies cowl EPC actions, pollution-control techniques and emission-reduction applied sciences. The firm gives FGD techniques, scrubbers, bag filters, cyclones, material-handling tools, surveillance, electrification and associated infrastructure options. Its FGD applied sciences embrace limestone, seawater and dry sorbent techniques designed to manage SO₂ and particulate emissions.

Ducon additionally executes bulk-material dealing with initiatives utilizing conveyors, pneumatic techniques, air slides and silos. It serves energy, mining, cement, oil and gasoline, refining, alumina and different course of industries by way of turnkey engineering and challenge execution capabilities.

Object of the Issue :

  • Adjustment of the Outstanding Unsecured Loan of Mr. Arun Govil, Promoter-cum-Managing Director of the Company, by way of Conversion into Equity Shares towards his Rights Entitlement.

  • Incremental working capital necessities.
  • General Corporate Purposes.

Read additionally: Upcoming Rights Issue

Ducon Infratechnologies Rights subject Review :

.gauge-card {
max-width: auto;
margin: 0 auto;
background: #ffffff;
border: 1px stable #e2e8f0;
border-radius: 16px;
padding: 10px;
box-shadow: 0 4px 6px -1px rgba(0, 0, 0, 0.05);
text-align: middle;
}

.gauge-title {
letter-spacing: 0.5px;
font-weight: 700;
margin-bottom: 5px;
}

/* Speedometer Container */
.gauge-wrapper {
place: relative;
width: 240px;
peak: 120px;
margin: 10px auto 0 auto;
overflow: hidden;
}

/* Arc Track */
.gauge-body {
width: 240px;
peak: 240px;
border-radius: 50%;
background: conic-gradient(
from 270deg,
#ef4444 0deg 60deg, /* Red (Avoid): 0 – 33% */
#eab308 60deg 140deg, /* Yellow (Caution): 33% – 78% */
#22c55e 140deg 180deg /* Green (Apply): 78% – 100% */
);
place: relative;
}

/* Inner Circle Cutout to make it a hoop */
.gauge-body::earlier than {
content material: ”;
place: absolute;
width: 180px;
peak: 180px;
background-color: #ffffff;
border-radius: 50%;
high: 30px;
left: 30px;
}

/* Needle Pointer */
.gauge-needle {
width: 4px;
peak: 90px;
background-color: #0f172a;
place: absolute;
backside: 0;
left: calc(50% – 2px);
transform-origin: backside middle;
rework: rotate(-90deg); /* Default place (0 rating) */
transition: rework 1.2s cubic-bezier(0.4, 0, 0.2, 1);
border-radius: 2px;
z-index: 2;
}

/* Center Pin */
.gauge-center-pin {
width: 16px;
peak: 16px;
background-color: #0f172a;
border-radius: 50%;
place: absolute;
backside: -8px;
left: calc(50% – 8px);
z-index: 3;
}

/* Score & Recommendation Styling */
.score-display {
font-size: 36px;
font-weight: 800;
shade: #0f172a;
margin-top: 15px;
}

.recommendation-badge {
show: inline-block;
padding: 6px 16px;
border-radius: 20px;
font-size: 15px;
font-weight: 700;
margin-top: 10px;
}

/* Dynamic Badge Colors */
.bg-apply { background-color: #dcfce7; shade: #15803d; border: 1px stable #bbf7d0; }
.bg-caution { background-color: #fef9c3; shade: #a16207; border: 1px stable #fef08a; }
.bg-avoid { background-color: #fee2e2; shade: #b91c1c; border: 1px stable #fecaca; }

Rights Issue Review Meter

0/100

Loading…


Based On Financial Overview

// =========================================================================
// EASY BACKEND CONFIGURATION: Put your rating worth right here (0 to 100)
// =========================================================================
const REVIEW_SCORE = 41;

// =========================================================================
// AUTOMATED LOGIC
// =========================================================================
doc.addEventListener(“DOMContentLoaded”, operate() {
const needle = doc.getElementById(“needle”);
const scoreValEl = doc.getElementById(“score-val”);
const badgeEl = doc.getElementById(“rec-badge”);

// Clamp rating between 0 and 100
let rating = Math.max(0, Math.min(100, REVIEW_SCORE));
scoreValEl.textContent = rating;

// Calculate Needle Angle (-90deg to 90deg)
// 0 Score = -90deg (Left)
// 50 Score = 0deg (Top Center)
// 100 Score = 90deg (Right)
let angle = (rating / 100) * 180 – 90;

// Rotate Needle
setTimeout(() => {
needle.fashion.rework = `rotate(${angle}deg)`;
}, 100);

// Set Recommendation Text & Badge Color
if (rating >= 80) {
badgeEl.textContent = “Apply for Long Term”;
badgeEl.className = “recommendation-badge bg-apply”;
} else if (rating >= 50) {
badgeEl.textContent = “Apply for Caution”;
badgeEl.className = “recommendation-badge bg-caution”;
} else {
badgeEl.textContent = “Avoid”;
badgeEl.className = “recommendation-badge bg-avoid”;
}
});

Ducon Infratechnologies Rights subject 2026 Details :

Event Name Details
Issue Open : September 03, 2026
Issue Close : September 10, 2026
Record Date : August 25, 2026
Issue Size : ₹24.99 Cr
Face Value : ₹1/ per share
Price Band : ₹1/ per share
Listing On : BSE, NSE
Shares Offer : 24,99,42,758
Ratio : 10:13
Important Link : LOF

Ducon Infratechnologies Rights subject 2026 Dates :

Activity Dates
Last Date to Buy Share : August 24, 2026
Record Date : August 25, 2026
Bid Open Date : September 03, 2026
Rights Entitlements : September 07, 2026
Bid Close Date : September 10, 2026
Allotment Date : September 11, 2026
Credit Date : September 15, 2026
Listing Date : September 16, 2026

Company Financial (in Cr):

Year Revenue Expense PAT
2026 ₹236.56 ₹232.52 ₹2.89
2025 ₹254.60 ₹247.70 ₹5.16
2024 ₹315.62 ₹298.74 ₹5.04
How to use Rights Issue :

  • Visit the registrar’s web site.
  • Go to the ‘Rights Issue’ part.
  • Select Rights Issue from the dropdown.
  • Enter Demat Account Number.
  • Fill the net software type.
  • Validate and submit the appliance.

.text-card {
width: auto;
background: #ffffff;
padding: 10px 12px;
border-radius: 12px;
border: 1px stable #E5EAF1;
box-shadow: 0px 2px 6px rgba(0,0,0,0.07);
line-height: 1.6;
}

.text-card-title {
font-size: 22px;
font-weight: 700;
margin-bottom: 10px;
shade: #000;
}

.text-card sturdy {
font-size: 16px;
}

.text-card a {
shade: #2266ff;
text-decoration: none;
}

.text-card a:hover {
text-decoration: underline;
}

Registrar of the Rights Issue :

Bigshare Services Private Limited
Address: Pinnacle Business Park,
Office No. S6-2, sixth Floor, Mahakali Caves Road,
Next to Ahura Centre, Andheri (East),
Mumbai, Maharashtra, India – 400 093
Contact No.: +91-022-62638200
Email id: rightsissue@bigshareonline.com
Email id: investor@bigshareonline.com
Website: www.bigshareonline.com

.text-card {
width: auto;
background: #ffffff;
padding: 10px 12px;
border-radius: 12px;
border: 1px stable #E5EAF1;
box-shadow: 0px 2px 6px rgba(0,0,0,0.07);
line-height: 1.6;
}

.text-card-title {
font-size: 22px;
font-weight: 700;
margin-bottom: 10px;
shade: #000;
}

.text-card sturdy {
font-size: 16px;
}

.text-card a {
shade: #2266ff;
text-decoration: none;
}

.text-card a:hover {
text-decoration: underline;
}

Company Address :
Ducon Infratechnologies Ltd.
Ducon House, Plot No. A/4, Road No. 1, MIDC,
Wagle Industrial Estate,
Thane, Maharashtra, India – 400 604
Contact No.: +91-9372239158,
Email id: cs@duconinfra.co.in;
Fax: +91-22-41122115;
Website: www.duconinfra.co.in

Disclaimer: Stock Market Investments are Subject to Market dangers, learn all scheme Related Document Carefully Before Investing.



Source link

#IPO #Bazar #upkeep

Happy
Happy
0 %
Sad
Sad
0 %
Excited
Excited
0 %
Sleepy
Sleepy
0 %
Angry
Angry
0 %
Surprise
Surprise
0 %
Social profiles